Owner:
Bayonne Hospital
201-858-5000
Architect:
Nadaskay/Kopelson
Allen Kopelson, Principal
973-539-5353
Construction Budget:
$4,900,000
Area:
15,000 SF (New Construction)
8,500 SF (Renovations)
Date of Completion:
1998
The first floor of this two-story addition will contain a state-of-the-art 40-bed emergency department with its own Trauma Room, complete with two Radiological and CT Diagnostic Rooms.
The north end features an enclosed garage for an emergency vehicle drop-off area. The second floor will contain a 24-bed Med./Surg. Unit with a 5,000 square foot Mechanical Equipment Room. The Hospital’s main entrance will be reconfigured to include a new Emergency Department drop-off.