Owner:
Morristown Memorial Hospital
Robert Peake, Director of Facilities Management
Architect:
Buckl Architects
Keith Kammerer
Construction Cost:
$19,491,351
Capacity:
1,154 Cars
Date of Completion:
December 2006
This five level parking garage at the Morristown Memorial Hospital is a galvanized steel frame with “Filigree” concrete decks. The exterior of this garage is clad with precast concrete and thin brick panels. The interior is fully sprinklered and has two hydraulic elevators and three stair towers.