Clinical Shell Fit Out

Client Memorial Sloan Kettering in

× Back To Projects
× Back Home


Owner:
Memorial Sloan Kettering Cancer Center

Architect:
Ewing Cole


Construction Budget:
$3.9 Million

Area:
7,154 SF

Date of Completion:
2020

This project is a fit out of the 1st Floor shell spaces for the Exam Room Area (3,000 SF), the Infusion Room Area (2,300 SF), the Linac Area (1,030 SF), Blood Draw Rooms (234 SF), a Physicists Office (101 SF), and an Ultrasound Room (246 SF). Additionally, the project contains the fit out of shell space on the 2nd Floor for a Treatment Room (243 SF).

Comments are closed.