Architect:
Stantec Architecture Inc.
Area:
1,870 SF
Date of Completion:
2017
Replacement of (2) existing linear accelerators and renovation of existing procedure and control rooms. Scope included new electrical rough for new equipment and systems. The equipment was rigged to the floor through the elevator shaft. Work was completed in two phases within an occupied and operational radiation oncology suite.